Abstract
In this design, on the basis of the mandate given by the system and the load line and all the parameters, load analysis of trends. Design First check the relevant information collection and research topic a lot of information and foreign-language translation of the relevant information and then load analysis of the precise calculation and analysis, load growth from the establishment of the need to clarify, and then passed on The proposed substation and the general direction of Chuxian to consider and, through the load data analysis, security, economic and reliability considerations, identified 110 kV and 35kV two voltage levels, compared with developed methods to determine the main wiring connections , The main wiring system to do the design, 110 KV side of the single-choice sub-bus connection mode, 35 KV sub-bus with bypass bus connection mode, and then through the load calculation and determine the scope of the main electricity transformer Number, capacity and Models, identified by two transformers, the capacity for 31500 KVA, the model SSZ9-31500/110, the reactive power compensation to a clear, and per-unit value method used to calculate a short-circuit analysis and treatment. According to the most sustained work and short-circuit current calculation of the results, the high-voltage fuse, isolating switch, bus and voltage transformers, current transformers for the selection. The main transformer for setting calculation and analysis, part of the mine were calculated and analyzed to determine the mine's method, using AUTOCAD and make the corresponding schematic. Thus completing the 110 kV/35KV electrical substation part of the design.
Key words:converting station;transformer substation;electrical wiring